    Construction site inspection form template

    The weekly walkthrough, structured: where each package stands, which snags were observed and exactly where, and who must close them.

    Who it is for

    This template accompanies the site manager during the walkthrough. It is made to be filled while walking, on a phone, often with no signal — a steel-framed building is enough to cut it. Capture continues and syncs on return. The order of sections follows the order of the walk itself, which is what stops it from being filled back at the site office from memory.

    The form structure

    Section by section, in the order they are filled in the field.

    01Visit

    • Sitechoice
    • Visit datedate
    • Weatherchoice

      Trivial-looking, decisive in a dispute over delay: bad weather is proven by a series of records, not by recollection.

    • Contractors on sitemultiple choice

    02Progress by package

    • Packagechoice
    • Estimated progressnumeric, percentage
    • Schedule variancechoice — on time, ahead, behind

    03Snags

    • Snag descriptionlong text
    • Location on the planpoint on an imported plan

      Inside a building, a GPS coordinate means nothing. The point goes on your own floor plan.

    • Photophoto
    • Responsible contractorchoice
    • Closure deadlinedate

    04Safety and sign-off

    • Safety points checkedmultiple choice
    • Site manager's signaturesignature

    Fields can be reordered, renamed and extended: this template is a starting point, not a fixed frame.

    What happens on submission

    A form that stops at collection leaves the work undone. Here is what submission triggers.

    • Each snag becomes a task assigned to the contractor concerned.
    • Closing requires an after photo: the file closes on evidence.
    • The visit report goes out the same day, in your own template.
    • A tracking page shows progress to the client, without opening your account.