    The site documents itself as it progresses

    Site visit reports with photos placed on the plan, snags assigned and tracked to closure, progress visible without making a phone call.

    What gets in the way today

    Photos go out by messaging app, snags are written in a notebook, and the report is drafted from memory in the evening. Three weeks later nobody knows whether a snag was closed, or who was supposed to handle it. Disagreements are then settled on recollections, which always costs more than writing it down on site.

    How it works

    1. 01

      The photo goes on the plan

      You import the site plan — an architect's PDF, an image — and place points on it. A snag sits exactly where it was observed, something no GPS coordinate can do inside a building.

    2. 02

      The snag carries an owner and a deadline

      Observed, assigned, dated. It stays open until it is closed, and closing it also requires evidence — the after photo.

    3. 03

      The report writes itself

      The visit report fills your own template from what was recorded, and goes out to recipients. In meeting mode the assistant also drafts the minutes and extracts the decisions made.

    4. 04

      The client follows without calling you

      A tracking page shows the current stage and the remaining snags, without opening your back office to them. That is what cuts down on "where are we?" calls.

    The modules involved

    No development: these are catalogue modules, already connected to one another.

    Three concrete situations

    Weekly walkthrough and snags

    The site manager walks the job, places findings on the plan and assigns them. The report goes out the same day rather than the following Monday.

    Handover and snag closure

    The snag list builds at handover, each with its photo. Closure requires the after photo: the handover file closes on evidence, not on ticked boxes.

    Subcontractor follow-up

    Each contractor sees the snags that concern them, in a partitioned space. Useful when several firms work the same package without needing to see one another.

    Frequently asked questions

    Can we use our existing plans?

    Yes: a plan PDF, a photo or an architect's export import as they are, and points go on top. No prior conversion, no drawing software.

    How do we know whether a snag has been closed?

    It stays open until someone closes it, and closing requires evidence. The tracking board shows what remains, by package and by contractor.

    Can the client check progress?

    Yes, through a public tracking page showing the current stage — with no access to the rest of your account. For a full space with documents and requests, the Client portal goes further.

    Does it work on a site with no network coverage?

    Yes. Capture and photos are kept on the device and sync when the signal returns. Available on every plan, including the free one.